Civic Infrastructure Review · Scenario Dashboard

A38 Corridor Infrastructure Impact Dashboard

Evidence base DfT traffic count baseline 16,530 vehicles · adjustable before scenario inputs

Stable infrastructure conditions

The selected scenario remains within indicative operating tolerances.

Green / Amber / Red
scenario signal
Risk score0
DfT baseline16,530
Dwellings0
Population0
Trips/day0
Peak delay+0.0
Economic loss£0.00M
GPs needed0.00

Highway capacity pressure

V/C means volume divided by capacity. Below 0.85 is broadly manageable; 0.85–1.00 is pressured; above 1.00 indicates likely capacity breach.

What am I looking at?

The bars show which corridor points become constrained first as developments and pressures are added.

Assumptions and limitations

This is an indicative public scenario tool. It does not replace validated junction modelling, NHS estate planning, statutory planning assessment or professional advice.

Healthcare infrastructure pressure

Population proxy for primary care capacity and potential mitigation.

Primary care capacity proxyCapacity remaining
Clinical space0 m²
Indicative S106£0.0k
Capacity used0%

Scenario summary

Current active inputs and result interpretation.

Baseline traffic note

This explorer starts from Department for Transport traffic count data: 16,530 vehicles on the A38 North Petherton / Huntworth corridor. The baseline uplift slider adjusts this starting traffic before scenario pressures are added. Development scenarios, HPC movements, logistics, tourism and M5 disruption are additional pressure above the adjusted baseline.